EN FR
EN FR
TASC - 2016
Overall Objectives
Application Domains
Bilateral Contracts and Grants with Industry
Bibliography
Overall Objectives
Application Domains
Bilateral Contracts and Grants with Industry
Bibliography


Section: New Results

Global Constraint Catalog Volume II: Time-Series Constraints

First this report presents a restricted set of 22 finite transducers used to synthesise structural time-series constraints described by means of a multi-layered function composition scheme. Second it provides the corresponding synthesised catalogue of structural time-series constraints where each of the 626 constraints is explicitly described in terms of automata with accumulators, see Figure 8 for the syntesised automaton of the sum surf peak constraint. (arXiv 1609.08925)

Figure 8. Synthesised automaton with accumulator of the sum surf peak constraint obtained from the transducer of the peak pattern
IMG/sum_surf_peak.jpg